1. Pre‑Planning & Free Site Survey
Companies like Güven Kardeşler start with a free on‑site survey. The visit identifies existing plumbing, wall composition (e.g., stone, plaster, concrete), waterproofing condition and any condominium board approvals required.
- •Wall‑break permissions based on building type (e.g., avoid damaging roof trusses in old stone buildings).
- •Leak inspection according to Istanbul Metropolitan Municipality’s Water & Sewerage Regulation.
- •Roughly 40 % of the budget goes to cabinets, fixtures and waterproofing materials.
2. Design Draft & Approval Process
The architectural team drafts a 1:1 scale plan, aligning new plumbing and electrical routes. The condominium board must sign off before work starts; otherwise fines may be imposed.
- •For bathrooms larger than 15 m² in Istanbul, an ‘Zoning Status’ report is mandatory.
- •According to the Building Inspection Regulation, the waterproofing layer must be at least 2 mm polyethylene.
3. Demolition & Infrastructure Prep
Old tiles and plasterboard are removed with a rotary hammer, avoiding any load‑bearing walls unless a structural engineer approves. Plumbing is rerouted using double‑wall PVC pipes to prevent future leaks.
- •In historic districts like Beşiktaş and Kadıköy, old plaster residues may hinder waterproof membrane adhesion.
- •Due to Istanbul’s humid climate, waterproofing must cure for at least 48 hours before tiling.
4. Waterproofing & Tiling
A two‑coat liquid membrane (polyurethane) is applied, with a 4 mm fiber reinforcement between coats. Then, slip‑resistant tiles are installed—especially important in coastal districts where water evaporates quickly, making anti‑slip surfaces essential.
- •Both walls and floor must be 100 % waterproof; even a 10 % gap can cause leaks.
- •With Istanbul’s average indoor temperature of 25 °C and 70‑80 % humidity, mortar curing takes longer; follow the manufacturer’s delayed cure schedule.
5. Installation, Final Checks & Warranty
Fixtures (shower, sink, toilet) are installed with leak‑proof fittings. A 24‑hour water test confirms no leaks. Güven Kardeşler documents the workmanship warranty in the contract—typically covering structural defects for two years.
- •Before handover, a ‘closure report’ is prepared with the building management, confirming all permits and compliance.
- •If a waterproofing issue appears within the warranty period, the repair and re‑testing are performed at no extra cost.
Frequently Asked Questions
- How many days does a bathroom renovation usually take?
- Typically 12‑15 working days, but older plumbing or delayed permits can extend the timeline.
- What permits are required for a bathroom renovation in Istanbul?
- Condominium board approval, a municipal Zoning Status report, and a building inspection certificate for waterproofing are mandatory.
- How should waterproofing be handled in historic buildings?
- Fully remove plaster residues, then apply a two‑coat liquid membrane with fiber reinforcement—the safest approach.
- Which cost items have the biggest impact in a bathroom remodel?
- Cabinets and fixtures account for about 40 % of the budget, waterproofing and tiling 30‑35 %, with labor and permits covering the remainder.
Planning a renovation?